6. Guy Anchor Maintenance Procedures
6.1 Tower inspection procedures should specify the following:
6.1.1 Periodic inspection of anchor rod condition below earth. (Note for inspectors: Corrosion is usually more severe near the concrete anchorage.) Inspection of a corroded anchor to include exposing, cleaning and measuring of anchor. Maintain structural capacity of the anchor during inspection. Attachment to a temporary anchorage may be advisable.
6.1.2 Tower inspection reports to state anchor corrosion control measures in place.
6.1.3 (As applicable) Cathodic protection system (i.e., AnchorGuard®) to be monitored once per year. Measurements in volts to show potential relative to copper-copper sulfate reference electrode.
General | Factors Affecting the Rate of Anchor Corrosion | Conditions that Require Corrosion Control Measures | New Guyed Tower Procedures | Corrosion Control Measures Guy Anchor Maintenance Procedures | References
|